For the realisation of a new bridge near the town of Tarnow, the new VARIOKIT cantilevered construction equipment was used for the very first time. The jobsite team achieved an optimal result with very small tolerances within a short construction ...
The Waldschloesschen Bridge spans the Elbe River with a shallow, elegant arch. PERI has planned and is supplying the formwork for the superstructure of the steel composite bridge, and won over the construction site team with an easy-to-use ...
For the 2.2 km long Danube bridge, Serbian and German PERI engineers, together with the Alpine project team, developed a customised formwork solution using the VARIOKIT parapet carriage. With four parallel operating units six casting segments, ...
The motorway bridge across the Rio Sordo is in the form of a 412 m long, five-section structure with two separate superstructures. The almost 20 m wide and 3.60 m high prestressed concrete hollow box girders are being realised using two different ...